Our Technology

From tyre to resources,
step by considered step.

Pyrolysis breaks tyres down with heat in the absence of oxygen — not by burning them. Below is the proposed process at a high level: what happens at each stage, and what it is designed to recover.

A note on detail: this page describes the proposed process conceptually. Operating parameters, equipment selection, yields and emissions performance will only be published once they are fixed by the final engineering design and validated.

Process overview

Stage by Stage

What happens, and why

Tyre reception & inspection

End-of-life tyres are received, inspected and recorded. Consistent, traceable feedstock is the foundation of consistent outputs — unsuitable material is rejected at the gate, not discovered in the process.

Preparation

Tyres are sorted and prepared for the reactor in the form the final process design requires. Where the design calls for it, steel bead wire may be separated at this stage; the remainder is separated after conversion.

Thermal conversion

The prepared material is heated in a sealed, oxygen-free reactor. Without oxygen it cannot burn; instead, the rubber decomposes into vapours, gases and a solid carbon-rich residue, while the embedded steel is freed intact.

Separation & condensation

Vapours are cooled and condensed into liquid oil. Solids are separated into recovered carbon black and steel. How process gas is handled and utilised will be defined by the final design.

Handling & storage of outputs

Each potential output is handled and stored according to its nature, ready for quality assessment. Specifications and commercial availability will follow validation — they are not claimed in advance.

Environmental control

Emissions and environmental controls will be specified by the verified engineering design and the applicable approval process. We will publish what the design commits to — when it commits to it — rather than general assurances now.

Stainless steel tanks for separation and storage (conceptual imagery)
Conceptual imagery — not the AHM facility.

Conceptual vs. Validated

Honest engineering, in the open

Industrial projects earn trust by sequencing claims after evidence. Ours will too:

  • Conceptual today: the stage flow above, potential output streams, indicative future scale.
  • To be validated: reactor design and parameters, yields, product specifications, emissions performance.
  • Published when proven: datasheets and performance figures will appear on the Materials page only with documentation behind them.

This page is educational. It is not an operating procedure and must not be used as one.

Discuss the Technology